Saturday 1 September 2012

THE COPS ARE ON THE SCENE + METALWORK PROGRESS

The downtown cops are getting in on the action this week and Rob Longley, my engineer, is busy on the steel framework structure that will take the mosaic and lettering panels.  

The steel frame components don't look very big in these photos but they are 4.5 metres tall and over 2 metres wide, and there are seven of them!! 


No comments:

Post a Comment